I have a pavid 45 kw generator head, (no engine yet) . It is a 12 wire set that I am told can be wired for 1,2,and 3 phase. It is presently wired 3 phase, parallel Y, 4 wire. Can someone tell me the wiring format for 120/240 single phase, 3 wire? my wires are marked T1-T12.I am aware that I may need to rewire some of the meters but I\'ll deal with that later. Right now I just need to know where the T wires go. thanks
If you need your Pavid unit tested or repaired,
give us a call at 1-336-969-0110.
We offer fair estimates and extended warranties on the work performed.
Shipping/Receiving:
Industrial Electronic Repair
145 Rockwell Place Ct
Tobaccoville, NC 27050
Phone: 1-336-969-0110
Industrial Electronic Repair
145 Rockwell Place Ct
Tobaccoville, NC 27050
🚑 Rush repair shipments only — no walk-ins.
Industrial Electronic Repair
931-E S. Main St #204
Kernersville, NC 27284
📦 Mailing Address (for invoices or shipped repairs)
No walk-ins accepted.